P. Janes Ltd – Fit Out Specialists

Glass and Drywall Partitioning

Project Info

  • Project Name: Glass and Drywall Bulkhead Installation
  • Location: Not specified
  • Client: Vendo Digital
  • Office Size: Not specified
  • Project Duration: 2 days on site

What Was the Client Looking For?

The client required a combined glass and drywall installation to create a sound-insulated partitioned area. The objective was to form a functional and private space using a mix of drywall bulkhead and glazed frontage with a door, while maintaining a clean and modern look.

What Did We Deliver?

P. Janes Ltd carried out the full installation, including:

  • Initial survey to confirm exact glass sizes and finalise client requirements
  • Site preparation: Cleared nearby furniture and laid full floor protection
  • Drywall bulkhead construction:
    • Double-boarded drywall with 50mm insulation to enhance soundproofing
    • Framework installed to support the structure and glazing
  • Glass installation:
    • Glass panels fitted with integrated door
    • All ironmongery installed
    • Final manifestation applied for privacy and visual safety

Any Challenges?

Although the site was located on the first floor, access presented a significant challenge. The stairwell had a tight corner which made it impossible to carry full-sized boards and glass through safely. The team overcame this by:

  • Protecting the metal stair railings
  • Sliding materials through the gaps between the rails and up the stairs manually

This solution allowed the materials to be transported safely without damage to the property or finishes.

Project Highlights

  • Clever Access Solution: Adapted to tight stairwell access by using a creative loading method
  • High Sound Insulation: Double-boarded drywall with insulation for effective noise reduction
  • Clean Glass Finish: Door and glass panels installed with precision ironmongery and compliant manifestation
  • Quick Turnaround: Full installation completed in just two working days

The Result

The completed installation delivered a smart, practical space with excellent acoustic insulation and a clean glass finish. Despite access constraints, the team worked efficiently to complete the job with no disruption to the surrounding area, leaving the client with a professional and polished result.